The meticulous choice and selection process of the Interior Designers and Client CAAS naturally requires the entire process to be reflected and understood by the contractors nominated to undertake the procurement and installation phase of the stonework packages for the floor and mural wall.

Scope of works

Granite floors for both the arrival and departure halls interlaced in 2 contrasting colours 300 metre length sandstone wall with inlaid stone carving skirting the entire Green wall providing a lush green welcoming atmosphere.

Consultant Team

Interior Design - Woodhead
Architects – CPG Singapore
Main Contractor – Shimizu Corporation